Skip to main content
DIAB Engineering -

Processing Facility Filter Building and Wet Circuit (SMPEI)

A highly technical SMP and E&I challenge involving everything from engineering, fabrication and construction to the installation and fitout of the processing site filter building.

  • SMPEI
  • Lynas Rare Earths
  • Kalgoorlie
  • $52 million
16 March 2026

Scope of works

  • Fabricating over 1500t of structural steel in our Geraldton workshop
  • All on-site installation personnel, equipment and tooling